Book your stay at the Copper House
Free Some beds booked Fully booked
- Catherine Fri 23 Oct 2026 → Sun 25 Oct 2026 (2 nights) 1 guest
- Bec and Cal Sat 26 Dec 2026 → Tue 29 Dec 2026 (3 nights) 6 guests
Housekeeping
8 of 10 beds need making up.
No cleans scheduled.
South Master
- King bed clean
South Bunks
- Single bed 1 needs making
- Single bed 2 needs making
- Single bed 3 needs making
North Master
- King bed clean
North Bunks
- Single bed 1 needs making
- Single bed 2 needs making
- Single bed 3 needs making
- Single bed 4 needs making
Gimp Room
- King bed needs making
Maintenance
7 open issues
Maintenance
7 open issues
-
high The dining room chairs
The chairs are damaging the floor, floor needs some love and the felt bottoms need replacing.
-
medium BBQ
The bbq needs new cast iron burners
-
medium Dining room chandelier
The light bulb in it is broken
-
medium Bar fridge
The bar fridge is being replaced.
-
medium Outdoor shower
The drain is pretty much clogged and all the dirt and crap needs to be shovelled out and cleaned. The taps also need new washers. The head drips unless you have goated wrist strength.
-
medium Leaking roof in rumpus and northern pod
Ben the builder investigating
-
low Toaster
The toaster is fucked and makes me rage
Completed (5)
-
medium Dishwasher
New Dishwasher has been ordered Needs to be delivered and installed in the coming weeks.
-
high Dishwasher broken
Technical fault F51 Cannot run a load, wont wash
-
medium Zip tap has a split personality disorder
Needs love to function
-
medium Irrigation system
-
low Sliding doors
Sliding doors from living room to pods need love